5-2 New plumbing stub ups (foreground).
Insulation, vapor barrier, steel wire and heat tubing in place.
New concrete is being poured.
Return to Previous Page
Updated 03/05/05
Photo and text copyright © 2005
George D. Sullivan
Web design by
Anne K. Alt
All rights reserved.